PEC Licensing
Firm registration, renewal, category upgrades and engineer cards on the Pakistan Engineering Council portal.
- Files
- 09
- With a published turnaround
- 08
- Desk
- Model Town, Lahore
Pick the file.
PEC firm registration
“Register a new constructor, operator or consulting firm on the PEC portal.”
- Confirm the correct track — constructor, operator or consulting
- Map your target category to its project limit, credit points and engineer requirement
- Check the firm name is available before anything else is filed
Foreign firm registration with PEC
“Registration for international engineering firms entering the Pakistani market.”
- Check eligibility: at least 51% foreign-owned, SECP-registered, and at least 70% Pakistani engineering staff
- Match the category to the tender and to your paid-up capital
- Get the profile, passports and financials embassy-verified or apostilled
PEC firm renewal
“Renew the licence before the year closes and the right to bid lapses.”
- Verify every attached engineer card is still live before you pay anything
- Refresh NTN, CNIC and biometric records as the portal requires
- Generate the challan for your category and file the renewal
PEC category upgrade
“Move up the ladder when your executed work orders (70% rule), credit points and engineers support it.”
- Read your current letter against the tenders you actually want
- Assemble work orders, performance certificates and bank evidence for the destination category
- Add the engineers the destination category needs, then file the change
Engineer card attachment
“Attach a valid engineer so the category’s credit-point requirement is actually met.”
- Verify the card is live and not tied to another firm in a way that will bounce
- Prepare the appointment and acceptance papers
- File the attachment and handle biometrics
Engineer card renewal
“Renew an individual Registered or Professional Engineer card.”
- File the portal application
- Assemble CPD and experience evidence where PEC asks for it
- Handle the challan and biometrics
Firm particulars change
“Update address, specialisation codes or the engineer list without touching the category.”
- Identify which particulars actually need amending
- File the amendment and follow it through
Ownership change on the PEC file
“Transfer or update ownership so the new owner can operate, bid and renew.”
- Map the PEC rules for your licence type
- Prepare the sale or succession papers
- Sequence the SECP work first where the firm is a company, then the PEC amendment
Firm type change on the PEC file
“Change the legal type on the licence so it matches your NTN and bank title.”
- Sequence the SECP or partnership-deed work first where it is needed
- File the PEC amendment
- Align NTN and the bank title afterwards
PEC Ladder
1 / 8
Yes — for engineering construction and most related public works, procuring agencies check the PEC constructor or operator category against the project cost. Work without a valid licence is how files get rejected and firms get into trouble.
Straightforward C-6 files often move in a few weeks once documents, engineer attachment, bank papers and biometrics are complete. Incomplete cards and PEC queries add time, and nobody outside PEC can honestly guarantee a calendar day.
No — constructor C-6 still needs the published minimum of one registered engineer and 5 professional credit points. We will not file a story the portal will reject.
Renew the personal engineer card first, then confirm it is still attached on the firm. A firm renewal filed with an expired attached card is how people lose weeks.
Start well before the licence year closes — the last week is when everyone else files too. Straightforward renewals often clear in two to six weeks after biometrics and payment.
No — only a real, available engineer with a valid PEC card. Fake attachment is how licences get cancelled.
Yes — the personal card must be current before it can be attached to the firm. Attachment with an expired card is refused on the portal.
C-6 is the entry constructor category, with a published limit of PKR 25 million per project; C-A has no published upper limit and needs far more professional credit points and senior engineers. The full ladder, fees and engineer rules are on our categories page and on pec.org.pk.
Only if the credit points and engineers for C-A are actually there and your executed works meet the 70% rule (for a jump of more than one step, accumulated works of at least 70% of the limit one category below C-A). Net worth based upgradation was abolished for applications after February 2, 2022 (PEC Registration Policy, amended upto June 28, 2024). Under PEC’s upgrade fee table a jump of three or more steps costs your current fee plus three times the destination fee: C-6 to C-A is PKR 1,215,000.
NTN first — the same name must sit on the NTN, the bank title and the PEC application. For most new constructor files we get the NTN (and the bank title) straight before the PEC upload; a name mismatch is the most common reason a first file stalls.
No — you pay the council challan in the firm’s name; our professional fee is separate and is not published. We generate or guide the challan so the amount matches the category, and we confirm the live figure on the portal.
WhatsApp us — firm name, what you need, and photos of whatever papers you already have. The office is two minutes from the PEC building in Model Town, Lahore.
PEC’s published constructor council fee runs from PKR 15,000 for C-6 to PKR 400,000 for C-A: C-6 PKR 15,000, C-5 PKR 30,000, C-4 PKR 45,000, C-3 PKR 75,000, C-2 PKR 125,000, C-1 PKR 150,000, C-B PKR 250,000, C-A PKR 400,000. This is the council challan only; confirm the live amount on the PEC portal before paying.
Each PEC constructor category caps the project cost a firm may bid: C-6 up to PKR 25 million, C-5 up to PKR 65 million, C-4 up to PKR 200 million, C-3 up to PKR 500 million, C-2 up to PKR 1,000 million, C-1 up to PKR 2,500 million, C-B up to PKR 4,000 million, C-A no published limit. Procuring agencies check this limit against the tender value.
PEC asks for rising credit points (PCPs) and registered engineers at each rung: C-6 5 PCPs, C-5 5 PCPs, C-4 15 PCPs, C-3 20 PCPs, C-2 35 PCPs, C-1 90 PCPs, C-B 120 PCPs, C-A 200 PCPs. Net worth no longer decides the category: PEC abolished net worth based registration and upgradation for applications after February 2, 2022 (Registration Policy, amended upto June 28, 2024). Upgrades are judged on executed works instead: for one step up, accumulated work orders of at least 70% of your existing category limit.
A PEC upgrade challan is your current category’s fee plus the destination category’s fee — once for one step, twice for two, three times for three or more. For example C-6 to C-5 is PKR 45,000, and C-6 to C-3 is PKR 240,000.
Use PEC’s own verification portal at verification.pec.org.pk: search the firm or engineer and it shows the registration and whether it is current. A tender committee checks the same record.
PEC publishes 136 constructor and operator specialisation codes across 4 disciplines: civil (CE), building construction (BC), mechanical (ME) and electrical (EE). A firm registers the codes for the work it will bid, such as CE01 for roads or EE for electrical works.
Related reading
- PEC Registration for Contractors in Pakistan: The Complete Guide
- PEC Contractor Categories C-6 to C-A: Limits, Fees and Requirements
- PEC Licence Renewal: Documents, Timeline and Mistakes to Avoid
- How to Upgrade Your PEC Category (and What It Really Costs)
- Engineer Attachment and PCPs: Why Your PEC File Needs a Real Engineer
- NTN, Bank Title and PEC: Why the Name Must Match Everywhere
- Sole Proprietor, Partnership or Private Limited: Choosing a Structure for Your Construction Firm
- Registering a Consulting Engineering Firm with PEC: The 51% Rule
- Operator vs Constructor: Which PEC Licence Does Your Firm Need?
- PEC Registration for Foreign Firms: The FC/FO Ladder, the 30% JV Rule and the Provisional Licence
- PEC Specialisation Codes Explained: CE, BC, ME and EE
- PEC Engineer Card Renewal: Why One Expired Card Can Stall a Whole Firm
- Selling or Inheriting a Construction Firm: Changing Ownership on the PEC Licence
- What Happens If You Work Without the Right PEC Licence: Fines, Suspension and Deregistration
- New PEC Constructor Firm: The Complete Document Checklist
- PEC Net Worth Requirement and Financial Documents, Category by Category
- How to Verify a PEC Licence Online: Check a Contractor and an Engineer Before You Hire
- Professional Engineer (PE) vs Registered Engineer (RE) for firm owners
- PEC Biometric Verification: Who Must Attend and When
- PEC C6 License: Fee, Project Limit and Requirements
- Engineer-owned construction firms: PEC fee and rules
- Engineer leaving a firm: PEC rules on resignation, NOC and joining another firm
- PEC Licence Approval: Which Committee Decides Your Category
- PEC licence validity and the 5 May renewal window explained
- PEC operator categories O-6 to O-A: limits, credit points and engineers
- PEC Renewal Fee 2026 for Every Category, and Paying for 1 to 3 Years
- Trainee engineers in PEC categories: how many each category needs
- PEC Upgrade Fee: How It Is Calculated, with Worked Examples
- Which Work Orders Count for a PEC Category Upgrade