Every Pakistan Engineering Council licence fee in one place: new registration, renewal and upgrade fees for constructor (C-6 to C-A) and operator (O-6 to O-A) categories, the foreign-firm fees in US$, and the fine for working without a valid licence. Figures from PEC’s Registration Policy, amended upto June 28, 2024.

The short answer: a PEC constructor or operator licence costs PKR 15,000 a year for C-6/O-6, rising to PKR 400,000 for C-A/O-A. Renewal is the same fee for each year you renew (one to three years). An upgrade costs your current fee plus the new category’s fee once, twice or three times, depending on how many steps you climb.

PEC constructor fee by category (C-6 to C-A)
CategoryFee a year (PKR)Project limitPCPsEngineers
C-615,000Up to PKR 25M5One registered engineer
C-530,000Up to PKR 65M5One registered engineer
C-445,000Up to PKR 200M1550% registered engineers
C-375,000Up to PKR 500M2050% registered engineers
C-2125,000Up to PKR 1,000M35One professional engineer plus registered engineers
C-1150,000Up to PKR 2,500M90Two P.E.s (10 years each) plus R.E.s
C-B250,000Up to PKR 4,000M120Two P.E.s (15 years each)
C-A400,000No limit200Two P.E.s (20 years each)
PEC operator fee by category (O-6 to O-A)
CategoryFee a year (PKR)Project limitPCPsEngineers
O-615,000Up to PKR 20M5One R.E.
O-530,000Up to PKR 30M5One R.E.
O-445,000Up to PKR 100M1550% R.E.s
O-375,000Up to PKR 200M2050% R.E.s
O-2125,000Up to PKR 500M35One P.E. plus R.E.s (one trainee)
O-1150,000Up to PKR 1,000M75Two P.E.s (10 years each) plus R.E.s (two trainees)
O-B250,000Up to PKR 2,000M100Two P.E.s (15 years each) plus R.E.s (three trainees)
O-A400,000No limit150Two P.E.s (20 years each) plus R.E.s (five trainees)

PEC renewal fee

  • A licence can be renewed for one, two or three years; the fee is the category fee for each year (para 8).
  • Renewing for more than a year still means applying online, biometric verification of owners and engineers, and the required trainee engineers on 1 July of every financial year.
  • Since June 28, 2024 a firm may renew during the validity of its licence, before 5 May, for up to three financial years.
  • The original expired licence is not needed at renewal; it is needed for an upgrade, ownership change or staff change.

PEC upgrade fee (constructors)

Rows are your current category, columns the category you move to. One step: current fee plus the new fee. Two steps: plus twice the new fee. Three or more: plus three times (para 9 and the policy’s up-gradation table). Operators pay the same figures for O-6 to O-A. A one-step upgrade also needs work orders worth at least 70% of your current category’s limit.

From ↓ / To →C-5C-4C-3C-2C-1C-BC-A
C-645,000105,000240,000390,000465,000765,0001,215,000
C-5—75,000180,000405,000480,000780,0001,230,000
C-4——120,000295,000495,000795,0001,245,000
C-3———200,000375,000825,0001,275,000
C-2————275,000625,0001,325,000
C-1—————400,000950,000
C-B——————650,000

PEC’s printed table shows 405,000 for C-5 → C-1, the same as the cell beside it; the rule gives 480,000, shown here.

Engineer-owned firms

A firm owned or shared by engineers pays a single fee of the desired category up to C-3/O-3. For C-2 (not O-2) the fee is three times: PKR 375,000. From C-2 upward, upgrades are charged like any other firm.

Fine for working without a valid PEC licence

A firm that executes work without a licence of the right category, or without a valid licence, pays a fine of three times the fee of the category it applies for (para 27). Working beyond the licence limit or without the engineers and PCPs leads to suspension and a hearing, and can mean de-registration for six months to three years.

Foreign firms (FC / FO), US$
CategoryFee (US$)Project limitPCPs
FC-1 / FO-110,000Up to US$ 25M90
FC-B / FO-B12,000Up to US$ 40M120
FC-A / FO-A24,000No limit200

Half the fee is paid for the provisional licence (bidding only) and half for the standard licence. A Pakistani partner must hold at least 30% of the joint venture. Foreign firm registration

Not on this page

Consulting engineering firm fees and individual engineer card fees follow separate PEC bye-laws and are not in this table. Ask us and we will quote the current challan.

PEC fee questions

What is the PEC fee for C-6?

PKR 15,000 a year for a new C-6 licence or a C-6 renewal. O-6 operators pay the same.

What is the PEC renewal fee?

The same as the category fee, for each year you renew: C-6 PKR 15,000, C-5 30,000, C-4 45,000, C-3 75,000, C-2 125,000, C-1 150,000, C-B 250,000 and C-A 400,000 a year.

How is the PEC upgrade fee calculated?

Your current category fee plus the new category fee: once for one step, twice for two steps, three times for three or more. C-6 to C-5 is PKR 45,000; C-6 to C-A is PKR 1,215,000.

Can I renew my PEC licence for three years?

Yes. PEC allows renewal for one to three years by paying the fee for each year, with biometric verification of owners and engineers every 1 July.

What is the fine for working without a PEC licence?

Three times the fee of the category the firm applies for, under para 27 of PEC’s policy. Working beyond the licence limit can lead to suspension or de-registration.

Does PEC still ask for net worth?

No. Registration and upgradation on the basis of net worth were abolished for applications after February 2, 2022. Upgrades are judged on executed work.

Source and last check

PEC Registration Policy 2017, guidelines for constructors/operators, amended upto June 28, 2024 (Tables A to D, paras 8, 9, 24, 25 and 27). Last checked 2026-11-17. Alqaim Engineers does not set these fees; the challan PEC generates is final. pec.org.pk