Skip to content
PEC Licensing · PEC

PEC firm registration

“Register a new constructor, operator or consulting firm on the PEC portal.”

Turnaround
3–8 wk
Council fee
PKR 15,000+
Documents
09
Steps
05
The outcome

A licensed firm on the Pakistan Engineering Council register, in the right category, with the engineers and papers the portal will actually accept.

Who it is for

  • A new constructor aiming at C-6 or higher
  • An operator firm on the O-series ladder
  • A consulting practice that must be licensed as a Pakistani consulting engineer firm
  • A firm that already has NTN or SECP papers and now needs PEC before bidding

What we do

  • 01Confirm the correct track — constructor, operator or consulting
  • 02Map your target category to its project limit, credit points and engineer requirement
  • 03Check the firm name is available before anything else is filed
  • 04Assemble CNICs, NTN, bank papers, engineer cards and affidavits
  • 05Drive the portal application and challan, then coordinate biometrics and queries

The paperwork

9 Documents
  • CNIC of the ownerYou already have · Every owner, partner and director — both sides, still valid.
  • NTN certificateFrom FBR · FBR certificate whose name matches the bank title and the PEC file.
  • Bank account in the firm titleFrom the bank · The title must match the NTN and the PEC application character for character.
  • Bank account maintenance certificateFrom the bank · Confirms the account is live in the firm name. Not the same paper as a bank statement or audited accounts.
  • Engineer’s PEC cardFrom the engineer · A live Registered or Professional Engineer card — copy from the engineer, verify on the portal before you file.
  • Engineer appointment letterYou already have · Issued by the firm, naming the engineer and the role.
  • Firm letterhead and stampYou already have · The printed name must match NTN, bank title and the PEC application.
  • Paid PEC challanFrom PEC · Generated on the portal for the right category, paid in the firm name.
  • Affidavit / declarationYou already have · Non-blacklisting and other declarations the PEC portal currently asks for.
Timeline

3–8 wk

Optimistic · 21 daysRealistic · 56 days

Simple C-6 files often move within a few weeks once documents and biometrics are complete. Higher categories, consulting ownership tests and expired engineer cards take longer. Nobody outside PEC controls committee dates.

Council fees
  • PKR15,000+

    Council challan — C-6 entry category; scales by category

    Varies by category · Source · Verified 2026-09-10

Council challans are paid to the authority. Our professional fee comes on WhatsApp.

PEC Ladder

C-6Rung
1 / 8
Bid up to
PKR25M
credit points
5
Council fee
PKR15,000
Engineers
One registered engineer
PEC Licensing

Questions about this area

The questions every new client asks.

  • Yes — for engineering construction and most related public works, procuring agencies check the PEC constructor or operator category against the project cost. Work without a valid licence is how files get rejected and firms get into trouble.

Next files

Related files

PEC Licensing
3–14 d
Tax & FBR

NTN registration

“Get the firm an FBR National Tax Number in the exact name you will use everywhere.”

  • Register on IRIS with the correct activity code
  • Follow through to the NTN certificate
2–6 wk
PEC Licensing

PEC firm renewal

“Renew the licence before the year closes and the right to bid lapses.”

  • Verify every attached engineer card is still live before you pay anything
  • Refresh NTN, CNIC and biometric records as the portal requires
  • Generate the challan for your category and file the renewal
4–8 wk
PEC Licensing

PEC category upgrade

“Move up the ladder when your executed work orders (70% rule), credit points and engineers support it.”

  • Read your current letter against the tenders you actually want
  • Assemble work orders, performance certificates and bank evidence for the destination category
  • Add the engineers the destination category needs, then file the change
5–21 d
PEC Licensing

Engineer card attachment

“Attach a valid engineer so the category’s credit-point requirement is actually met.”

  • Verify the card is live and not tied to another firm in a way that will bounce
  • Prepare the appointment and acceptance papers
  • File the attachment and handle biometrics