Which Work Orders Count for a PEC Category Upgrade
Public and private jobs, JV and sub-let shares, the three-year window and the 60% completion test: what PEC counts toward the 70% rule, and what it cannot count twice.
01Which work orders are eligible?
- Public department work orders, each with a satisfactory performance certificate in the Annex-C form, showing at least 60% completion and signed and stamped by the department and the firm’s owner (para 9).
- Private and sub-let work, with the contract agreement between employer or prime contractor and the firm, a performance certificate of at least 60% completion verified by the employer or consultant, and at least 25% of each payment evidenced by online transfer, invoices or cheques linked to a bank statement (para 11).
- Joint venture and sub-contract work, at the firm’s corresponding share. A prime contractor, sub-contractor or JV partner gets the benefit of the share of work it executed (note under paras 9 and 11).
Under para 9 each work needs its own certificate showing at least 60% completion, so a work without one does not count toward the total, whatever its value. The 60% test applies to each work separately, not to an average across the firm’s portfolio. Public and private works each need their own document set.
02How is the 70% figure worked out?
For one step up, the accumulated worth of the counted works must be at least 70% of your existing category limit (para 9). Using the project limits on our PEC schedule, a C-6 firm (PKR 25 million per project) needs counted works worth about PKR 17.5 million to move to C-5. A C-5 firm (PKR 65 million) needs about PKR 45.5 million to move to C-4. For a jump of two or more steps, the test is 70% of the limit one category below the one you want, so C-6 to C-4 is measured against the C-5 limit: PKR 45.5 million. The policy says “worth” but does not define whether it means contract value or value executed, so confirm that with PEC.
03Can one work order count twice?
No. A work order taken into account for one upgrade is not reconsidered for any later upgrade (para 9). Plan the order of your upgrades before the first file, because the same works cannot carry two of them. Where a prime contractor and a sub-contractor, or JV partners, share one job, each counts only its own share, so the full value is not counted twice.
04Which date decides the three-year window?
Para 9 counts works awarded or executed during the last three years from the date you submit the online application. Para 11, for private and sub-let work, speaks of three financial years. Before you count a work order at the edge of the window, confirm with PEC which measure applies to your file. Work completed outside that window does not count for the file, even with a valid certificate.
Under para 9 the work must be awarded or executed in the three years before you submit the online application. Para 11 uses three financial years for private work, so confirm which measure the portal applies.
For public work, a satisfactory certificate in the Annex-C form showing at least 60% completion, signed and stamped by the department and the owner. For private work, one showing the same 60%, verified by the employer or consultant.
No. Each prime contractor, sub-contractor or JV partner counts its corresponding share of the executed work, under the note to paras 9 and 11.
No. A work order taken into account for an upgrade is not reconsidered for further upgradation (para 9).
More from the blog
- PEC3 min readPEC Registration for Contractors in Pakistan: The Complete GuideConstructor, operator or consulting — which track, which category, which papers, and how long a new PEC firm registration really takes.2026-10-05Read
- PEC2 min readPEC Contractor Categories C-6 to C-A: Limits, Fees and RequirementsEvery rung of the PEC constructor ladder — project limit, credit points, engineers and council fee — from the published schedule.2026-10-05Read
- PEC2 min readPEC Licence Renewal: Documents, Timeline and Mistakes to AvoidWhat to check before you pay the renewal challan, the documents PEC asks for, and why the last week of the licence year is the worst time to file.2026-10-05Read
- PEC2 min readHow to Upgrade Your PEC Category (and What It Really Costs)Work orders, engineers, credit points and the destination fee — what PEC looks at when you move up the ladder, and why multi-step jumps cost more.2026-10-05Read