PEC category upgrade
“Move up the ladder when your executed work orders (70% rule), credit points and engineers support it.”
- Turnaround
- 4–8 wk
- Council fee
- PKR 45,000+
- Documents
- 07
- Steps
- 04
A higher category letter, so you can bid above your current project cap.
Who it is for
- C-6 firms now bidding above the PKR 25 million cap
- Firms adding specialisation codes
What we do
- 01Read your current letter against the tenders you actually want
- 02Assemble work orders, performance certificates and bank evidence for the destination category
- 03Add the engineers the destination category needs, then file the change
- 04Track the enrolment committee
The paperwork
7 Documents- Current PEC licenceFrom PEC · The letter the firm already holds, including category and codes.
- NTN certificateFrom FBR · FBR certificate whose name matches the bank title and the PEC file.
- Bank statement, CA-verified or audited accountsFrom the bank · Last year’s bank statement, or accounts verified by a Chartered Accountant, or an audited financial statement (any one). Distinct from the maintenance certificate.
- Work ordersOther · Completed work in the firm’s name, for a category upgrade or a tender deck.
- Performance certificatesOther · Issued by the procuring agency or client for the work orders you are relying on.
- Engineer’s PEC cardFrom the engineer · A live Registered or Professional Engineer card — copy from the engineer, verify on the portal before you file.
- Paid PEC challanFrom PEC · Generated on the portal for the right category, paid in the firm name.
4–8 wk
Often four to eight weeks once the pack is complete. Committee calendars vary, and a jump of two or more steps costs two or three times the destination fee.
PKR45,000+
Upgrade challan — C-6 to C-5, from PEC’s upgrade table; rises with the jump
Varies by category · Source · Verified 2026-10-06
Council challans are paid to the authority. Our professional fee comes on WhatsApp.
PEC Ladder
1 / 8
C-6 is the entry constructor category, with a published limit of PKR 25 million per project; C-A has no published upper limit and needs far more professional credit points and senior engineers. The full ladder, fees and engineer rules are on our categories page and on pec.org.pk.
Only if the credit points and engineers for C-A are actually there and your executed works meet the 70% rule (for a jump of more than one step, accumulated works of at least 70% of the limit one category below C-A). Net worth based upgradation was abolished for applications after February 2, 2022 (PEC Registration Policy, amended upto June 28, 2024). Under PEC’s upgrade fee table a jump of three or more steps costs your current fee plus three times the destination fee: C-6 to C-A is PKR 1,215,000.
Each PEC constructor category caps the project cost a firm may bid: C-6 up to PKR 25 million, C-5 up to PKR 65 million, C-4 up to PKR 200 million, C-3 up to PKR 500 million, C-2 up to PKR 1,000 million, C-1 up to PKR 2,500 million, C-B up to PKR 4,000 million, C-A no published limit. Procuring agencies check this limit against the tender value.
PEC asks for rising credit points (PCPs) and registered engineers at each rung: C-6 5 PCPs, C-5 5 PCPs, C-4 15 PCPs, C-3 20 PCPs, C-2 35 PCPs, C-1 90 PCPs, C-B 120 PCPs, C-A 200 PCPs. Net worth no longer decides the category: PEC abolished net worth based registration and upgradation for applications after February 2, 2022 (Registration Policy, amended upto June 28, 2024). Upgrades are judged on executed works instead: for one step up, accumulated work orders of at least 70% of your existing category limit.
A PEC upgrade challan is your current category’s fee plus the destination category’s fee — once for one step, twice for two, three times for three or more. For example C-6 to C-5 is PKR 45,000, and C-6 to C-3 is PKR 240,000.
7 documents: Current PEC licence, NTN certificate, Bank statement, CA-verified or audited accounts, Work orders, Performance certificates, Engineer’s PEC card, Paid PEC challan.
Typically 4–8 weeks once the file is complete. Often four to eight weeks once the pack is complete. Committee calendars vary, and a jump of two or more steps costs two or three times the destination fee.
Upgrade challan — C-6 to C-5, from PEC’s upgrade table; rises with the jump: PKR 45,000, varying by category. It is paid to PEC; our professional fee is quoted separately on WhatsApp.
Related files
Engineer card attachment
“Attach a valid engineer so the category’s credit-point requirement is actually met.”
- Verify the card is live and not tied to another firm in a way that will bounce
- Prepare the appointment and acceptance papers
- File the attachment and handle biometrics
PEC firm renewal
“Renew the licence before the year closes and the right to bid lapses.”
- Verify every attached engineer card is still live before you pay anything
- Refresh NTN, CNIC and biometric records as the portal requires
- Generate the challan for your category and file the renewal