New PEC Constructor Firm: The Complete Document Checklist
Every paper a new PEC constructor file needs, who issues it, and the mistakes that get a file queried.
01Which papers does PEC actually ask for?
PEC’s Guidelines for New, Renewal and Up-gradation of Constructors/Operators Licence (amended upto June 28, 2024) do not print one master list for a constructor. They fix the requisites and the verification steps, and the portal asks for the rest as the application runs. The list below combines that policy with the documents on our PEC firm registration service. Treat it as a working checklist and confirm what the portal shows on the day you file.
02The checklist, and who issues each paper
- CNIC of the owner, and of every partner or director — NADRA. Still valid, both sides.
- NTN certificate in the firm’s exact name — FBR, through IRIS. For C-6 the policy accepts the owner, sole proprietor or firm name.
- Bank account in the firm title — your bank. Title must match NTN and application.
- Bank account maintenance certificate — your bank. It is a different paper from a net-worth certificate.
- Engineer’s PEC card — PEC. It must be live, not expired.
- Engineer appointment letter and acceptance letter — the firm and the engineer.
- Firm letterhead and stamp — you. The printed name must match everything else.
- Paid PEC challan — generated by the portal during the application, paid at the bank. C-6 is PKR 15,000.
- Undertaking of the owner, partner or CEO — generated by the portal (Annex-A of the policy). It declares the firm is not blacklisted, has no litigation and has not been declared bankrupt.
- Partnership deed or SECP incorporation papers — only if the firm is a partnership or company. The policy asks for SECP evidence for new engineer-owned registration in C-3 and C-2.
03Biometrics: owner and engineers
The policy makes biometric verification of the owner, leading partner and CEO mandatory for every new registration, at a PEC office, and only a PTA-registered mobile number in the owner’s or partner’s name is accepted. Each employed engineer gets a PEC Attachment Code by SMS from 8138, valid for 5 days, and verifies at a NADRA e-Sahulat franchise (the policy states PKR 160). The online application is submitted once all engineers are done.
04Why new files get queried
These come from the policy’s own rules and from how files stall in practice; the second group is market experience, not a PEC publication.
- In the policy: an engineer who is not biometrically verified, or whose attachment is wrong, is not processed.
- In the policy: fake or incorrect documents or affidavits lead to legal action and suspension under the penalty table.
- Market practice: the firm name differs between NTN, bank title and application.
- Market practice: the engineer’s card has expired, or the engineer is already attached elsewhere.
- Market practice: the owner’s mobile number is not in his or her own name.
05What to check before you file
- 01Settle the exact firm name and register the NTN in it
- 02Open the bank account in that name and get the maintenance certificate
- 03Confirm the engineer’s live card and agreement, and send the PAC for biometrics
- 04Complete the owner’s biometrics, then submit and pay the challan
Fees and limits follow the PEC schedule on pec.org.pk. Confirm the live challan on the portal before paying.
Owner’s CNIC, NTN, a bank account and maintenance certificate in the firm title, an engineer with a live PEC card plus appointment letter, letterhead and stamp, the paid challan and biometric verification, as listed on our PEC firm registration service.
PEC’s policy accepts an NTN in the name of the owner, sole proprietor or firm for C-6. Keeping NTN, bank title and application identical still avoids queries.
Yes. The policy makes it mandatory for the owner, leading partner and CEO on new registration, and each employed engineer is verified at a NADRA e-Sahulat franchise.
Not under the policy’s C-6 requisites. SECP evidence is required for new engineer-owned registration in C-3 and C-2, and for company structures it is the firm’s own paper.
More from the blog
- PEC3 min readPEC Registration for Contractors in Pakistan: The Complete GuideConstructor, operator or consulting — which track, which category, which papers, and how long a new PEC firm registration really takes.2026-10-05Read
- PEC2 min readPEC Contractor Categories C-6 to C-A: Limits, Fees and RequirementsEvery rung of the PEC constructor ladder — project limit, credit points, engineers and council fee — from the published schedule.2026-10-05Read
- PEC2 min readPEC Licence Renewal: Documents, Timeline and Mistakes to AvoidWhat to check before you pay the renewal challan, the documents PEC asks for, and why the last week of the licence year is the worst time to file.2026-10-05Read
- PEC2 min readHow to Upgrade Your PEC Category (and What It Really Costs)Work orders, engineers, credit points and the destination fee — what PEC looks at when you move up the ladder, and why multi-step jumps cost more.2026-10-05Read