The pec upgrade fee is your current category fee plus the destination fee, multiplied by the number of steps. Three worked examples show the sums and the work each one needs.

PEC2 min read

01What is the formula, step by step?

Para 25 gives three criteria: one step up costs the fee of the desired category; two steps up cost two times the desired category; three steps and onward cost three times the desired category. Written as a sum, the challan is the current category’s fee plus the desired category’s fee multiplied by the number of steps, capped at three. The constructor table in para 25(i) prints the result for each pair of categories.

One cell needs care. The printed table shows C-5 to C-1 as 405,000, which is a copy of the C-5 to C-2 figure beside it. The formula gives 30,000 + 3 × 150,000 = 480,000, and that is the amount to plan for, so a quote is never below the rule.

02How much work do I need to show?

Para 9 makes upgradation performance based. Works must have been awarded or executed in the three years before the online application, with at least 60% completion, and PEC needs work orders and satisfactory performance certificates from public departments. Then the money test applies:

  • One step up: the accumulated work must be at least 70% of your existing category limit.
  • More than one step up: the accumulated work must be at least 70% of the limit of the category just below the one you want.
  • A work order used for one upgrade cannot be counted again for a later one.

03Three worked examples

  • C-6 to C-5, one step: fee 15,000 + 30,000 = PKR 45,000. Work needed: 70% of the C-6 limit of PKR 25 million, which is PKR 17.5 million.
  • C-4 to C-2, two steps: fee 45,000 + 2 × 125,000 = PKR 295,000. Work needed: 70% of the C-3 limit of PKR 500 million, which is PKR 350 million.
  • C-6 to C-3, three steps: fee 15,000 + 3 × 75,000 = PKR 240,000. Work needed: 70% of the C-4 limit of PKR 200 million, which is PKR 140 million.

The amounts match the published table cells for these pairs, so you can check each against the table yourself. Each example assumes the work orders fall within the last three years and that each shows at least 60% completion. Add up the qualifying orders before you generate a challan, because a short total fails the test whatever fee you pay.

04Do engineer-owned firms pay the same?

Not necessarily. Para 5 of the policy treats engineer-owned and shared firms separately, and their upgrade limits depend on the engineer’s experience. Ask which fee table applies to your firm before you generate the challan. Rules on fees are set by the Governing Body, so check the current policy at pec.org.pk and the live challan on the portal before you pay.

Have a file like this? Send it to the desk.Ask the desk
PEC

Quick answers

The questions every new client asks.

  • Add the current category’s council fee and the destination category’s fee, then multiply the destination fee by the number of steps, up to three. One step is the destination fee once, two steps twice, and three or more three times.