01What is the renewal fee for each category?

The council fee for each category is the figure in our PEC fee schedule, cited from pec.org.pk as effective 1 January 2017 and checked on 10 September 2026. The C-6 renewal challan starts at PKR 15,000, the same as the new-registration fee. For the other categories the portal generates the challan for your own category, so confirm the amount it shows before you pay.

  • C-6 — PKR 15,000
  • C-5 — PKR 30,000
  • C-4 — PKR 45,000
  • C-3 — PKR 75,000
  • C-2 — PKR 125,000
  • C-1 — PKR 150,000
  • C-B — PKR 250,000
  • C-A — PKR 400,000

Para 18 of the policy says the challan is generated during the online application and paid at the designated bank. PEC then verifies the payment automatically through its bank integration. Pay the amount on the challan the portal produced for your application, not a figure from an old receipt or a previous year.

02Can I pay for one, two or three years at once?

Yes. Para 8(i) of the policy says a firm may apply for renewal for one year to three years, subject to deposit of the fee for the number of years. Our reading is that a three-year renewal means three annual fees: a C-6 firm renewing for three years pays 3 × PKR 15,000 = PKR 45,000 in council fee. The portal sets the amount you actually pay, so check the total on the challan.

For a renewal of more than one year, para 8(i) also requires the following on 1 July of every financial year:

  • Apply online
  • Return the original PEC licence, if it is still valid
  • Biometric verification of all engineers, including the owners
  • Trainee engineers as Table A and B require for your category

03Can I renew early, or after the licence has expired?

Para 8(ii) allows renewal during the validity period of the licence, for up to three financial years, after the same biometric checks. Para 8-A says an expired original licence is not needed for an online renewal, but the original is needed for an upgradation, change of ownership or change of engineering staff. A firm that missed a year faces arrears and a surcharge; we have no sourced figure for that surcharge, so the portal calculation is the only answer.

PEC’s fee page could not be re-checked on 17 November 2026, so the figures above are the latest we can cite. Confirm the live challan on the portal before you pay.

Have a file like this? Send it to the desk.Ask the desk
PEC

Quick answers

The questions every new client asks.

  • The council fee for C-6 is PKR 15,000 for the year. Confirm the challan the portal generates for your category before you pay.