PEC Renewal Fee 2026 for Every Category, and Paying for 1 to 3 Years
The pec renewal fee starts at PKR 15,000 for C-6 and rises by category; here is how a one to three year renewal is charged.
01What is the renewal fee for each category?
The council fee for each category is the figure in our PEC fee schedule, cited from pec.org.pk as effective 1 January 2017 and checked on 10 September 2026. The C-6 renewal challan starts at PKR 15,000, the same as the new-registration fee. For the other categories the portal generates the challan for your own category, so confirm the amount it shows before you pay.
- C-6 — PKR 15,000
- C-5 — PKR 30,000
- C-4 — PKR 45,000
- C-3 — PKR 75,000
- C-2 — PKR 125,000
- C-1 — PKR 150,000
- C-B — PKR 250,000
- C-A — PKR 400,000
Para 18 of the policy says the challan is generated during the online application and paid at the designated bank. PEC then verifies the payment automatically through its bank integration. Pay the amount on the challan the portal produced for your application, not a figure from an old receipt or a previous year.
02Can I pay for one, two or three years at once?
Yes. Para 8(i) of the policy says a firm may apply for renewal for one year to three years, subject to deposit of the fee for the number of years. Our reading is that a three-year renewal means three annual fees: a C-6 firm renewing for three years pays 3 × PKR 15,000 = PKR 45,000 in council fee. The portal sets the amount you actually pay, so check the total on the challan.
For a renewal of more than one year, para 8(i) also requires the following on 1 July of every financial year:
- Apply online
- Return the original PEC licence, if it is still valid
- Biometric verification of all engineers, including the owners
- Trainee engineers as Table A and B require for your category
03Can I renew early, or after the licence has expired?
Para 8(ii) allows renewal during the validity period of the licence, for up to three financial years, after the same biometric checks. Para 8-A says an expired original licence is not needed for an online renewal, but the original is needed for an upgradation, change of ownership or change of engineering staff. A firm that missed a year faces arrears and a surcharge; we have no sourced figure for that surcharge, so the portal calculation is the only answer.
PEC’s fee page could not be re-checked on 17 November 2026, so the figures above are the latest we can cite. Confirm the live challan on the portal before you pay.
The council fee for C-6 is PKR 15,000 for the year. Confirm the challan the portal generates for your category before you pay.
Yes. Para 8 of the 2024 guidelines allows a renewal for one to three years, with the fee deposited for each year. Biometric checks on 1 July each year apply to a renewal longer than one year.
The council fee for C-A is PKR 400,000 on the schedule we publish, cited as effective 1 January 2017. The amount on the portal challan is the one to pay.
Not for a one-year online renewal, because para 8-A says an expired original is not needed. A valid original is returned for a renewal longer than one year, and it is needed for an upgrade or a change of ownership.
More from the blog
- PEC3 min readPEC Registration for Contractors in Pakistan: The Complete GuideConstructor, operator or consulting — which track, which category, which papers, and how long a new PEC firm registration really takes.2026-10-05Read
- PEC2 min readPEC Contractor Categories C-6 to C-A: Limits, Fees and RequirementsEvery rung of the PEC constructor ladder — project limit, credit points, engineers and council fee — from the published schedule.2026-10-05Read
- PEC2 min readPEC Licence Renewal: Documents, Timeline and Mistakes to AvoidWhat to check before you pay the renewal challan, the documents PEC asks for, and why the last week of the licence year is the worst time to file.2026-10-05Read
- PEC2 min readHow to Upgrade Your PEC Category (and What It Really Costs)Work orders, engineers, credit points and the destination fee — what PEC looks at when you move up the ladder, and why multi-step jumps cost more.2026-10-05Read